Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Battery R&R
01-05-2007, 06:44
Post: #4
Battery R&R
Turn off the inverter(s) if they have separate switching.

Pete Masterson
aeonix1@...
'95 Blue Bird Wanderlodge WBDA 42'
El Sobrante, CA




On Jan 5, 2007, at 8:18 AM, Curt Sprenger wrote:

> This afternoon or tomorrow, I plan to remove the six 6V batteries and
> install six new T-105s. My plan of attack is to have the Electronic
> Master Switch set to off, shore power disconnected, generator battery
> disconnected. Anything more that I should do before removing the six
> batteries? Thanks.



[Non-text portions of this message have been removed]
Quote this message in a reply
Post Reply 


Messages In This Thread
Battery R&R - Curt Sprenger - 01-05-2007, 04:18
Battery R&R - Leroy Eckert - 01-05-2007, 05:06
Battery R&R - Curt Sprenger - 01-05-2007, 05:50
Battery R&R - Pete Masterson - 01-05-2007 06:44
Battery R&R - Curt Sprenger - 01-05-2007, 07:15
Battery R&R - Gardner Yeaw - 01-05-2007, 12:48
Battery R&R - Curt Sprenger - 01-05-2007, 16:57



User(s) browsing this thread: 1 Guest(s)