One project begats another...
|
08-17-2013, 12:17
Post: #1
|
|||
|
|||
One project begats another...
The new fridge project somehow inspired the removal of old front carpet and replacement with cork flooring. The carpet looked in decent shape, but I suspected it was causing a lot of dust as it is now 13 years old and probably deteriorating. Removal was as expected, lots of staples to pull and a few surprises in the way BB transitioned to things like the passenger seat mount and the entry stairs. Basically, they just laid up padding and cut the top coat of plywood back from the edge. This required adding material to level the entire floor for the cork.
I used floating cork planks attached to an underlayment that snaps together like laminate flooring. This matched the height of the kitchen/bath vinyl floating floor for a perfect transition. Here I laid out the new flooring on the deck.
Here are shots of the finished floor.
Corey Noble Laurel Park, NC 2000 LXi 46,000 miles and counting Added features: Overbuilt cycle lift, built-in vacuum, flat panel LCD TVs, Vetus macerating toilet, Samsung fridge, Lifeline batteries, headlight cover removal campaign. |
|||
1 user Likes gondolaguy's post |
« Next Oldest | Next Newest »
|
Messages In This Thread |
One project begats another... - gondolaguy - 08-17-2013 12:17
RE: One project begats another... - davidbrady - 08-17-2013, 19:41
RE: One project begats another... - Ms. Bee - 08-17-2013, 21:21
RE: One project begats another... - ernie ekberg - 08-18-2013, 08:40
RE: One project begats another... - gondolaguy - 08-18-2013, 10:46
|
User(s) browsing this thread: 1 Guest(s)